Update 7.7.12
A quick update! Doing more roof in the morning. The adhesive didn’t come in for the weekend so it wont get finished tomorrow but it’s probably good to break it up a little anyway with the 100 degree weather slated over the next week. We have a gallon and a half of adhesive so I’m thinking we can get 1 -1.5 more sheets up. I still need to run and grab about 30 more pallets. I need to remove the nails from the ones disassembled today and plane them all down a bit then I am ready to get going there too! I got the kitchen sink, the only big items left to purchase that I can think of right now is the washer/dryer and the finishes (drywall, tile, counter-tops/counter materials etc.). Here is what I have for now:

I got this kitchen sink today from Craigslist. It is an undermount white sink, brand new, never installed. I bought it for about 15% of the cost. Win!

I had just shy of 30 pallets to disassemble, I was super excited to use the tool Nate made me listed in the previous post.

20 minutes later I was half way done...

40 minutes, all done! Amazing! Thank you Nathan! This would have taken about 4 days with the cat claw/hammer like I was doing before 🙂

I got my Ivy clippings for the roof today also. I stole these from the yard at my work, they are ripping out all the ivy this week i was told so I thought I had better hurry and grab some while it was there. This is my roof 🙂

The only con is having girly little office hands... I got a blister.

How long does it take for these things to go away. This is from when I hammered my finger installing the light receptacles a LONG time ago.

My water filter is in under the bathroom sink.

My shower head and control piece is in and ready to go!

For the lav in the bathroom.

good job!
Thanks Rob!
One of your pics looks like you totally mushed a white lab rat 🙂
Ha! I wasn’t seeing it but then I found it! I didn’t, I assure you! 🙂