Preliminary Schedule
Here is a very preliminary schedule for my tiny house project. I currently have a lease that goes until the end of May 2012, by then I should have oodles of time to build my tiny house. Here is the breakout by month, roughly at this point
November:
- Buy trailer move to interior workshop to be worked on for winter
- Start design documents (figure out details, finishes, fixtures, systems etc.)
December:
- Prepare trailer foundation (insulation and floor system)
- Build walls
- find/build doors and windows to be used
January:
- Complete erecting walls and roof
- Sheath/weather wrap building
- Insert doors and windows into openings
- Rough in plumbing and electrical
- Find fire place
February:
- Order toilet and solar panels
- Install exterior siding
- Install metal roofing
- Drywall interior
- Complete plumbing and electrical
March:
- Sell possessions not needed for tiny house
- Order any furnishings needed
- Finish interior of space
April:
- Move trailer to exterior location
- Test systems and adjust as needed
- Furnish space
- Begin looking for a space to park trailer closer to downtown
May:
- Vacate apartment and move into tiny house!
Two years to come:
- Test systems and record what I learn.
LOVE your pie chart! Sums up my whole life. 🙂
hehehe!